It’s Game On for Bet365 Staff

You can bet on improved staff wellbeing: The Stoke-on-Trent based online gaming company invested £7.7m to improve the health and wellbeing of its staff at their headquarters in Etruria Valley. We were contracted to build a steel-framed leisure and training facility, comprising of 3-floors of changing rooms, offices and meeting rooms. Externally MUGA tennis and football pitches, external pitch lighting, formation of land-scaping and planting was installed.

The main building structure comprises:

  • strip and pad foundations
  • structural steel portal frame over the sports hall
  • 3-storey steel frame to changing rooms
  • offices and training rooms
  • Euroclad metal clad and Forticrete
  • architectural masonry façade, with aluminium curtain walling
  • Euroclad metal clad pitched roof
  • Wards TopDeck flat roofing panel
  • aluminium rainwater goods
  • polyester powder coated steel security doors
  • canopies to changing room entrances

bet365 Leisure & Training Facility, Etruria Valley, Festival Park, Stoke-on-Trent

Client: St Modwen Developments PLC

Value: £3.7M

Contract Period: 38 weeks

Contract: JCT Design and Build Contract